The new Manta Hospital, located in the coast of Ecuador, is the third healthcare center that PMMT Architecture, based in Barcelona and Madrid, has built in this country. With more than 24.000 m2, it offers its services to 200.000 inhabitants of the city of Manta

In 2016, the province of Manabí suffered a devastating earthquake that completely destroyed the former Manta hospital. Given this context, the construction of the new equipment was needed as soon as possible. Therefore, it was decided to build a new health center following the parameters of the “Fluid Hospital”, a methodology created and developed by PMMT Architecture. Previously PMMT had already designed and built two other hospitals in Ecuador in the cities of Machala (2016) and Puyo (2013). Both buildings were also a response to the need of being built in record time – less than a year from the beginning to the end of construction – and with a tight budget. Such working methodology consists in defining those parameters which, correctly combined, guarantee the good functioning of the healthcare building as well as its adaptation to future changes: this involves parametrizing the organization and location of the corridors according to their use (public, private, maintenance, supplies…), the metrics of the layout and blocks, the modulation of the façade, the strategies for future extension, vehicular access, location of the installation galleries and other regulations that are vital for the beginning of the construction works. and has become a benchmark hospital, thanks to three main features: its universal accessibility measures, that make it absolutely inclusive; the hyperflexibility achieved by its the parametric design system; and the earthquake-resistant structure and façade. These aspects make it one of the most innovative hospitals at an international level.

Read more

Source: archdaily

Pictures by BIKUBIK for archdaily